VWLD introduces DC De Kling and DC Spekhof
Two new sustainable distribution centres strengthen the logistics hotspot of South Limburg
VolkerWessels Logistics Development (VWLD) proudly presents the launch of the leasing of two high‑quality logistics developments in South Limburg: DC De Kling in Heerlen and DC Spekhof in Kerkrade. Both projects are located in the rapidly growing logistics region of Parkstad and represent an important addition to the regional logistics landscape.
Spekhofstraat 16
DC Spekhof – Kerkrade: state‑of‑the‑art distribution centre
Sustainable, modern and strategically located
Location & accessibility
DC Spekhof is situated at Businesspark Spekholzerheide in Kerkrade, directly adjacent to the German border and offering fast connections to the A76, A79 and A2 motorways.
Space & specifications – DC Spekhof
- approx. 27,129 m² warehouse
- approx. 2,396 m² mezzanine
- approx. 1,518 m² office space
- 166 parking spaces
- 30 loading docks
- Clear height: 12.20 m
- Building can be divided into 2 separate units
- Sustainable delivery with BREEAM Very Good, LED lighting and electric heat pumps
Availability
The environmental permit for DC Spekhof has been granted, and construction of the project can start immediately.
DC de Kling
DC de Kling – Heerlen
Flexible, future‑proof and optimally accessible
Location & accessibility
DC De Kling is located on Kleinestraat in Heerlen, with excellent connections to Germany, Belgium and the rest of the Netherlands thanks to the nearby N281 and A76.
Space & specifications – DC De Kling
- approx. 18,854 m² warehouse
- approx. 1,700 m² mezzanine
- approx. 498 m² office space
- 93 parking spaces
- 24 loading docks
- 2 ground‑level overhead doors
- Clear height: 12.20 m
- Super‑flat floor according to DIN 15185; mezzanine floor load 750 kg/m²
- Sustainable development with BREEAM Very Good ambition, electric heat pumps and LED lighting
Like DC Spekhof, DC De Kling offers a modern, uniform and efficient logistics layout suitable for various types of logistics operations.
Availability
DC De Kling can be delivered within 10 months after signing the lease agreement.